Showing posts with label Finished Objects. Show all posts
Showing posts with label Finished Objects. Show all posts

Friday, January 6, 2017

Frogging, Finishing and Starting Fresh

These are my favorite knitting project bags.  
Star Trek and Hobbit are by Stitched by JessaLu and the British Telephone Box is by Zigzag Stitches.


I started in December re-accessing my knitting WIP's as there were many which left me feeling weighed down.  They took up room, filled every project bag I own, and inhibited my starting anything new.  I had heard a quote that went something along these lines "If I can stand to stop knitting on a project, it is probably not something I really truly want."  Sadly, I don't remember where I heard it or the exact wording, but the sentiment is right.  It got me thinking about how we sometimes really do need to let go to make space for something even better.  I, like many of you I'm sure, get wrapped up in the amount of time I've already given that item and feel it's all for naught if I don't finish it.  Well, if you look at it from a different perspective, that item, while not completed, has already brought me excitement in the planning process and casting on, comfort in the actual knitting and possibly it has even given me practice at some new skills.  So, it wasn't a wasted effort, but maybe more of a pastime until the right project comes my way.  You know the type of project I'm talking of, the one you can't put down, that seems to knit itself, or that is just what you needed to complete your wardrobe.

Thus a frogging I went through all my project bags.  A couple of scarves here, a beautiful yet too small mitten there, a brioche poncho, a gorgeous sleeveless top and others met there end to my ripping back the yarn.  But isn't that the lovely thing about knitting though?  That you can reuse the yarn (well unless it's mohair then you might just be stuck throwing it out.)  I do think it's the reason I've stopped stressing as much over my knitting.  When yarn is recoverable to make anew with, unless it's the aforementioned mohair, the "risk" of wasting money is slight and that eases my mind.  The only thing truly gone is your time and as I mentioned previously that's really all in how you look at it. 

Now, looking at the projects I am carrying over into this new year I find they are ones I really do want.  The double knit mittens to match the hat I already finished and wear all the time, 2 sweaters that will add to my wardrobe, a stole which is such a perfect match for it's yarn, a pair of vanilla socks as I always take some with me as my on the go project, a late Christmas gift scarf (it's a bit of a boring knit, but the recipient can sure use it) and lastly a cowl out of the remainder of my handspun yarn.  So yes, there are still quite a number of projects crossing over into the new year.  I am not a monogamous knitter by any means, yet I do hope to get back down to only 3 projects at a time:  socks, sweater, and a neck or home accessory.  Thus, I am hoping to restrain myself from casting on anything new until a few more WIP's have become FO's. 

So, while I have no fresh cast on with which to begin the new year I feel as if I am starting fresh with my freshly sorted WIP's and future plans.  Now, on to re-accessing the yarn stash which is due for a good tossing.  How do you start the new year with regards to knitting?

Wednesday, January 4, 2017

Yarn Along - First Finished Object of the Year


Well, I did get what I wanted for Christmas, but not what I wanted for New Year's.  Instead of starting out the New Year with the intentions I wrote about in my last post, I started the year with a stomach virus and all the ickiness that goes along with that sort of sickness.  I'm simply going to call this a false start and begin again this coming weekend when hopefully we are all back to our normal selves, because, of course, it hit all three of us.  Only our poor black lab Easy escaped unscathed, unwalked sadly, but at least healthy with lots of family snuggle time.

I did manage to finish a knitting project as I was only half a dozen rows from completion.  Doing a couple rows a day in-between bouts of discomfort and 3 days later my first finished object of the year is done.  It's yet another, albeit now the last, set of 4 Cozy Coasters by Joelle Hoverson from her book More Last Minute Knitted Gifts.  I used Frog Tree Sport Melange Alpaca yarn held double and US 9/5.5mm needles to make a 4 inch/10 cm square, which I found to be a better size for our mugs than the much smaller size the pattern as written creates.  They will be the first addition to the knitted Christmas Gifts box for 2017 making them the absolute earliest knitted Christmas gift I ever completed which tickles me to no end.  The fact that I finally used up the yarn I purchased nearly four year's ago is just icing on the cake as the saying goes.

As for reading, this being Yarn Along and all, I just finished Sheepish:  Two Women, Fifty Sheep and Enough Wool to Save the Planet  by Catherine Friend.  I borrowed it from the Library on a whim and was I delighted with a wonderful story!  It's about a woman whose partner rather drags her into becoming a sheep farmer, the trials of being a writer and full time farmer and her finally understanding "Fiber Freaks" as she calls them in the beginning of the book.  It was a nice mix of reality (the romance of having my own sheep is now utterly gone), humor (animals are funny after all) and journey of discovery.  The fun fact that their farm is only a few hours from where I live was such an added treat to discover while reading, that we may actually go visit if they still do tours.  

Hopefully your beginning to 2017 went the way of your heart's desire and you are all healthy and well.  Are you finishing old projects or starting the year afresh?  I 'd love to hear all about it!

Wednesday, December 30, 2015

Finishes and Frogging



I had a swarm of finished objects here at the end of December.  Most were gifts for Christmas and one was a just languishing project. The gift knitting was not coming along as I wanted it too, but I did rally managing to put aside my Fair Isle Vest for the time being.  First up were the two scarfs for my friend Anna's friends, who have now become my friends (don't you love it when that happens?)  The one was a lattice design using a thick aran weight yarn, the other was simply textured in a luxurious angora/silk yarn.  When I finished those two knits I quickly wrapped them posting them just in time for Christmas.  Phew!  Then comes my biggest accomplishment - I finished my mothers' cardigan sweater.  Wow, I just love how it came out.  The best part is the colorwork was much looser this time around (I knit this same sweater for her 2 years ago and my stranded knitting came out pretty tight) so it was a breeze to block into shape.  The collar lays down much better too on this version, as I made a few discrete decreases in the last couple rows.  It is a touch big on her, but she really loves it and that's the main point.  

After that project I whizzed through making some felted slippers for my son.  He asked for them way back in September so I'm a bit late getting to them, but now they are done.  They are Minecraft themed after a famous Youtuber iBallisticsquid who my son watches.  His Minecraft character is a squid and this is what the face looks like.  You see my son already has the same size feet as I do (US sized 8 1/2 Women's) at the mere age of 9 so the "fun" slippers for children don't fit him anymore.  And being only nine he of course wants fun slippers. Thankfully they were a hit.

My last completed object is a pillow of a chicken for myself.  It's the Oluffa doorstop by Lucinda Guy.  I have no use for a doorstop, or a pillow either for that matter, but I adored this pattern the moment I saw it.  It was my Christmas Day knitting and I finished her in just a few days.  We're still thinking up a name for her - any ideas?  The only tricky thing is there are some very long floats, but I did a bit of duplicate stitch in some areas to get around that.  All in all it's a very fun knit with embroidery added and I would highly recommend it to anyone.  

I was hoping to finish my White Russian sweater by Thea Coleman as it was already about 1/2 done, but sadly I frogged it instead of finishing it.  The sleeves were really, really big and I tried to fix them twice, but decided it is ultimately a flawed design for my body shape and desired fit.  I have a large bust, but average sized arms and with a top down raglan the only way to enlarge the bust is to enlarge the sleeves as well.  After reading more about sweater designs I am going to go back to a bottom up pieced sweater with set in sleeves.  You really have lots more control over sizing when knitting all the pieces separately and seaming afterwards.  Thus I frogged it, re-skeined the yarn and gave the yarn another bath so it will be all smooth and fresh with which to knit another sweater.  This is the sweater I'm planning on with an added turtleneck.  It will be my first Custom Fit Amy Herzog sweater so I thought I'd keep it simple.  

Today I'm swatching for a fresh knit to start in January.  My first choice is a Fair Isle turtleneck sweater for myself and second is this cabled vest for my husband.  I really should do my husband's first as he did not receive a knitted gift this year for Christmas, but oh the colors for the first are fabulous!   What are you working on?  Planning for the new year or just winging it?  I'm loosely planning to knit a mix of new and old projects, taking my time and knitting only things that I really love.  Happy New Year everyone!

Joining in with Ginny for Yarn Along.

Thursday, June 4, 2015

Finished Project Pics!


Not sure why I look crabby, must be my reaction to something my Hubbie said.  Ha!


See the change in the color variegation?  I didn't blend the 2 skeins of Malabrigo Lace as I should have.


Here's my Hubbie Dan.  Isn't he handsome in his Shetland Vest.


Just a quick post today to show you some of my finished projects.  Up first is my Gemini Summer Top pattern by Jane Richmond.  It fits really well, but the shoulders do slip a bit.  I knit a few rounds of garter on the neck edge ( not done in the original pattern) to help prevent this, but I think it needed to be a tighter gauge altogether (for the lace part that is.)  So, if I were to knit this one again I would go down a needle size for the lace and keep the same size needle for the body.  The Hemp yarn I used has a lovely weight to it and feels really good next to my skin.  Now, if it would only warm up enough to wear it.

Next up is my Hubbie Dan's Shetland Vest.  I was only lengthening this sweater about 2 inches in the stockinette body portion and re-knitting 2 inches in the ribbing.  I talked about how I did that here.  It fits him very well now and he can reach upwards and not expose his stomach.  I am very pleased I did not have to re-knit this whole sweater.  Shetland is a grabby yarn and doesn't like being frogged much.

Dan's cabled vest is almost done too!  My oldest WIP by far - 3 years if you can believe it.  I have the ribbing around one armhole to do today then block it.  I didn't run out of yarn either and in fact have leftovers.  All that worrying for naught.  What's coming off your needles?

Joining in with Andrea for Fibre Arts Friday
 Linda for Creative Friday
Jenna for Freshly Finished Friday 
Beth for Flash Your Finishes Friday